Built Camberwell 29 with Porter Davis. Site Start was 27 July 2010 and Handover was 22 December 2010.
Thursday, September 16, 2010
Day 51: Doors installed
Doors are installed & locked, couldn't get inside the house anymore.
Laundry Door
Plumbing for Evaporative Cooling was done but it was put at a wrong spot, it should have been toward the back of the house instead of the middle of the house.