Built Camberwell 29 with Porter Davis. Site Start was 27 July 2010 and Handover was 22 December 2010.
Sunday, September 5, 2010
Day 40: Went on site to check how it goes
Went on site this morning to see how the frame goes. Some of the wood used for the frame need to be replaced, I think. We'll see what the inspector will say on Wednesday.
This is where the bath tub going to go.
A small backyard that we are going to have, not sure what we are going to do with it, probably will have to build a retaining wall.