A big stuff up with the power points in the bathroom, didn't check this during electrical appointment, expecting them to put them as per normal, i.e. next to the bench, but somehow it was wrongly put inside the cabinet 600mm above the floor. Only realised this last week after I didn't see any power points during the walk through with the SS. Checked the electrical plan again & it is indeed put where it is shown in the plan.
Built Camberwell 29 with Porter Davis. Site Start was 27 July 2010 and Handover was 22 December 2010.
Wednesday, November 10, 2010
Day 106: Bricks have been washed & a big stuff up
They washed the bricks today & it comes out better than we expected. Glad we chose this instead of Mocha.




A big stuff up with the power points in the bathroom, didn't check this during electrical appointment, expecting them to put them as per normal, i.e. next to the bench, but somehow it was wrongly put inside the cabinet 600mm above the floor. Only realised this last week after I didn't see any power points during the walk through with the SS. Checked the electrical plan again & it is indeed put where it is shown in the plan.
A big stuff up with the power points in the bathroom, didn't check this during electrical appointment, expecting them to put them as per normal, i.e. next to the bench, but somehow it was wrongly put inside the cabinet 600mm above the floor. Only realised this last week after I didn't see any power points during the walk through with the SS. Checked the electrical plan again & it is indeed put where it is shown in the plan.
Subscribe to:
Post Comments (Atom)
Coming along nicely. Bummer about the power point.
ReplyDeleteWas wondering what type of bricks and the colour/type of the roof tiles?
Thanks
Thanks. Good thing is our girl is now not even 6yo yet, so she'll have plenty of time to adjust to the fact she has to plug in her hair dryer inside the cabinet :)
ReplyDeleteBrick is Kurrajong & Roof is Macquarie, colour is Gunmetal