Built Camberwell 29 with Porter Davis. Site Start was 27 July 2010 and Handover was 22 December 2010.
Saturday, July 3, 2010
Asphalt & second soil test
The asphalt used to cover the footpath after Jemena did the Under Ground Pit sunk (see photo below). Trying to get them to replace the asphalt with reinforced concrete.
PD has received the result of 2nd soil test & the engineering department is working on it. They are also applying for the permit soon, so hopefully we'll have a site start within the next week or two.
Jemena will contact your local council and arrange for their subcontractors to concrete around the power pit, can take ages for them to get around to it (took them about 2 months to do ours!)
Jemena will contact your local council and arrange for their subcontractors to concrete around the power pit, can take ages for them to get around to it (took them about 2 months to do ours!)
ReplyDeleteT&T
Thanks T&T for the info. Requesting them to do it asap as I consider it a hazard for the people walking over it.
ReplyDeleteDid you take single phase or or phase 3 underground pit for your new house?
ReplyDeleteThanks
I had a single phase, was told that 3 phase would be unnecessary for what I need.
ReplyDeleteWe were told the same. Thanks