Built Camberwell 29 with Porter Davis. Site Start was 27 July 2010 and Handover was 22 December 2010.
Thursday, August 5, 2010
Day 7: Pipes, Drainage, Meter Box & Retaining Wall
Work is continuing, they've now installed the Meter Box, Retaining Wall, Drainage & Pipes.
Luke the SS called me & told me that they are going to do the piering this week & Slab to be poured either on Monday/Tuesday, weather permitting. Followed by meeting on site after the slab has been poured.