Monday, May 9, 2011

Day 138: Maintenance Completed

Trueloc came to check the floorboard last Wednesday & he gave the floorboard a wax. He told us to wait for few weeks & if we are still not happy with how it turns out, they'll get it replaced. Not sure whether I want it to be replaced, the inconvenience of having to take a day off & waiting for them to come & replace it is just not appealing.

The leak on the roof cannot be fixed. The maintenance guy came out for the 3rd time last Friday & he told me that everything was done to the standard. He suspected the leak happened during a very heavy storm (which it was) & the wind blew the water back into the roof from the valley - I suspected this all along but I still want them to give me some explanation & check the work. I will keep monitoring this matter & if it doesn't leak under normal condition, then I'll leave it.

No comments:

Post a Comment